国产日韩激情av_日韩无弹无毒av影院_午夜在线理不卡片在线视频_主页亚洲视频专区_亚洲小电影在线观看的网址_秋霞电影院午夜伦高清_大学生特黄特色大片免费播放_欧美成人精品福利网站_可针对河卵石、鹅卵石、白云岩等物料_97国产精品免在线

ENGLISH
banner
Deputy Director of SCZJMPC Jianrong Qian and his delegates Visit Hailiang Stock for Research and Guidance
2019-05-21

On the morning of 2nd April, Jianrong Qian, deputy director of Standing Committee of Zhuji Municipal People's Congress (SCZJMPC), Hongwei Zhu, vice mayor of Zhuji City, Peiguang Wang, vice chairman of Zhuji Municipal People's Political Consultative Conference, together with their colleagues, visited Hailiang Stock’s Zhejiang base to provide guidance on the construction of its red copper pipe intelligent workshop project. Yali Feng, secretary of the Party Committee of Hailiang Group, Lirong Jiang, general manager of Hailiang Stock’s Copper Pipeline Division, accompanied them during the visit.


15584055598170059rHX.jpg

1558405598927988JqyV.jpg


Officials from different government departments in Zhuji had a closer look in terms of the new equipment, new technologies and new processing of Hailiang Stock’s red copper pipe intelligent workshop, and expressed their affirmation on the workshop’s real-time monitoring system and the intelligent production line application. They believed that the construction of the workshop will play a positive role in driving relevant industries and promoting a sustainable, fast and sound development of the economy.


1558405649992243z3Vx.jpg


Hailiang Stock’s red copper pipe intelligent workshop, through improving the existing pipe production process and researching and developing equipment, will establish a digital production line for pipe fittings with independent intellectual property rights. The equipment slow in speed, low in efficiency, high in energy consumption and low in production rate will be knocked out, whereas automatic loading and unloading by robots, automatic cleaning, automatic packaging and non-contact automatic detection line will be realized. Meanwhile, intelligent software management systems such as manufacturing execution system (MES system, including data acquisition, simulation, etc.), factory command center system, data analysis system, and cloud computing system will be introduced. After the project is put into production, a daily production capacity of 350,000 copper pipe fittings is expected, and an annual production of 3,600 tons is estimated. Moreover, the workshop will enhance the production efficiency by 300%, save labor cost by 75%, reduce production cost by 40%, and save 8 million CNY per year.


1558405685360280SjWc.jpg